Encourage on -site innovation technology and reform strict -sitqualy management 2024-07-23 16:21:24 internet

The mining area refers to the construction area of ??coal mining.When the excavation area team conducts construction work in the mining area, it shall strictly abide by the relevant provisions of construction management.Let me introduce it in detail below!
Strict on -site quality management
(1) Formulate the unit price linked to quality.The work zone cannot be punished at will, so that workers should be taken orally and consciously do the quality, instead of pressing the workers to do it.
For example: a tug -in and supporting tube is 2 yuan, a piece of board is 1 yuan, and the feet are 1 inch of 1 inch of one inch. The system is set first. It is not an individual for everyone.
Leave the top plate and hang the top board. When the top is a small unit, there is no major work award. The material code is placed. A single or a metal bracket covering the bracket is transported 5 yuan, and 1 yuan is placed in accordance with regulations.
2. It is important to study the Operation Regulations.The work zone regularly organizes large, small workers, squad leaders, backbone learning quality standardization and "operation regulations".
3. Organizational quality standardization team. There are 5-6 high -quality repair teams in the work area to make examples to drive the overall quality.
4. Responsibility is in place.We stipulate that the quality standardization responsibilities of the squad leader, the large worker, and the deputy district may not be punished.
5. Supervision in place.The leaders of the working zone are inspected every two days of the quality and civilized and sanitary inspections of the area under the jurisdiction of the district, and rectify the place where the work is not in place.
Encourage on -site innovation technology and reform
(1) Falling the cover bracket to the sloppy road, solving the connection of the series, saving the salary of salary, material costs, etc.
(2) The shelf uses double nuts, which improves the efficiency of racks and saves material costs.
(3) After the rack surface is tightened for 1 to 2 cycles, a nut is re -tightened to ensure that the shelf will not be reversed.
(4) When the wind alley is out of advance, find that the mountain is not right, and the three sandwiches are placed with the angle line, and then cut again.Prevent reverse phenomena.
(5) Early use of the rack surface to calculate the binding of 3 to 4 cycles, so as to do not put on top coal.
(6) The "two -way assessment" of the changing zone of the changing belt is the same as the tonal coal and slot.
(7) Entering the semi -coal rock lane, the money of the shed, each of which ranges from 30 to 60 yuan, but it is required to be 2, one is not supplemented, and the unit price cannot be adjusted to ensure the progress of the excavation.
Regulations for attendance management of the excavation area team
1. Employees of the excavation district team must ensure that the number of days is above the prescribed number of days, and the district teams must formulate employee attendance management and work injury management regulations, and strictly implement the rotation system.
2. During the period of festivals and agricultural busy, the district team must formulate relevant reservoir measures.
3. Employees have special circumstances for more than 5 days in a row (including 5 days). They must be approved by the chief of the mines for more than 5 days with the consent of the head of the supervisor.
4. The district captain must grasp the duty work in person. The community teams attendance rate must not be less than 83%(attendance includes study, business trips, nursing staff), and the dispatch room is responsible for inspection.For the queue), the head of the supervisor was 50 yuan.When the wage distribution system is formulated in the working area, the salary shall be deducted accordingly.
5. If the attendance rate of each class does not meet the requirements, the head of the supervisor is 30 yuan/percentage point; the employees do not obey the district teams diligence system, and the district team is handled and the circumstances are seriously submitted.