As the crushing equipment advances forward, the cutting head in the working institution continues to crush the rocks and transport the crushed rocks.It has the advantages of safety, efficiency, and quality of Chengxiang, but the cost is large, the structure is complicated, and the loss is large.Let me introduce it in detail below!
What are the precautions when trying the car
1. Follow the magnetic starter hand handle handlebars.
2. Press the button to open two or three times;
3. Starting and air rotation for 1 to 2 weeks.
4. Joint operation of the reprint machine and crusher.
5. Check no abnormality and issue a boot signal.
6. There must be no shock in the mechanical and motor during operation, the sound and humidity should be normal, the temperature of each bearings does not exceed 75 ° C, and the temperature of the motor must not exceed the regulations of the manufacturer.
7. The chain of the reprinted machine must be consistent. In the case of full load, the chain is not allowed to exceed the length of two chain rings, and there must be no card chain or jump chain phenomenon.
8. After reprinting the molten plug or frying piece of the machine, the wood or other materials shall not be replaced by wood or other materials.
9. The safe device of the crushers protection network should be kept intact. During the work process, it should be checked frequently. If it is damaged, it should be stopped immediately.
10. Safety devices such as the tail protection of the carrier must ensure intact.
Step of broken device operation
Prepare:
1. Tools: wrench, pliers, screwdriver, small hammer, iron 锹, etc.;
2. The necessary reserve accessories: the insurance sales of various short -connect chains, chains, bolts, nuts, crusher, etc.;
3. Lubricating oil and diarrhea.
Check and processing:
1. The connectors of the motor, reducer, hydraulic joint axis, head, and tail must be complete, intact, and tight.The reducer and hydraulic axis shaft shall have no oil seepage and oil leakage, and the amount of oil should be appropriate.
2. The signal must be sensitive and reliable, and no signal is not allowed to be turned on.The spray sprinkle water device should be guaranteed intact;
3. The power cable and the operation line must be neatly hanging, without squeezing;
4. Coal, vermiculite, debris and motors, and reducers near the head of the machine must be cleaned and clean;
5. The overlap between the head of the conveyor machine and the rearring machine should be appropriate;
6. The scraper chain board is moderate, and the scrape and screw must be fully tight;
7. The car truck must be smooth and reliable;
8. When the machine is reproduced in part of the machine, the operation of each uncle should have no abnormal sound, and the scraping board, chain, and connection ring should be twisted, twisted, and curved;
9. The lane lane support at the crusher and crusher must be intact and firm;
10. The safety protection network and protection device of the crusher must ensure that it does not deform, without failure, safe and reliable;
11. The lane lane support at the reprinted and crusher must be intact and firm.
How to install a trial car for broken equipment
1. Pay attention to the vertical of the main body and level when installing.
2. The device should be installed on the horizontal concrete and fixed with a foot bolt.
3. Configure the power cord and control switch according to the power of the device.
4. Check whether the bolts of each part are loose and whether the host warehouse door is tight after installation.
5. After the inspection is completed, the empty load test is performed, and the test can be produced normally.