The full -frame scaffold, also known as the red scaffolding, is a construction process for building a scaffolding.The scaffolding of the scaffolding of the scaffolding of the scaffolding is high, and it is clear that it is clear that the house is full.Full -handed scaffolding is more stable than other scaffolding.
Red scaffolding price
The price of red scaffolding is about 599 yuan, and the interior wall decoration of more than 3.6 meters will no longer calculate the decorative scaffolding separately, and the masonry scaffolding of the interior wall is still calculated according to the scaffolding of the scaffolding.
Calculation rules full of red scaffolding
1. Horizontal protective racks are calculated according to the actual level projection area of ??the pavement.2. The vertical protective rack is set up from a natural floor to the top horizontal rod, and it is calculated by the actual set of length and calculated in the square meter.3. The masonry storage warehouse scaffolding, regardless of the single tube or the storage group, is performed according to the single -border line of the single tube, and the height of the outdoor floor to the outlet of the storage warehouse is calculated at the height of the outlet to the mouth of the storage warehouse.4. Water storage (pumping) pool scaffolding, according to the height of the outer wall from the outer wall from the outdoor floor to the top surface of the pool wall, calculate it in square meters.5. Basic device basic scaffolding, from its shape, multiplying the floor to the top side of the top surface, is calculated in square meters.6, overhead transport scaffolding, calculate the rice according to the set length.7, chimney and water tower scaffolding, different height calculations are calculated at different heights: elevator well scaffolding, based on single holes calculated by seat seat: Different heights are calculated at different heights.
The construction plan of red scaffolding red scaffolding
I. Engineering overview of the height of the plate surface of this layer is 15.87m, the ground elevation is ± 0.000, and the height of the layer is 15.87m.The total projection area of ??the floor of the floor is: 350m2, which is a beam -like floor, the thickness of the board is 180mm, the largest beam section size is 450 × 3100mm, and the area of ??other beam section is within 0.9m2.The steel pipes of φ48 × 3.5 are set up, and the main rod is arranged to: CKL (1) in the K axis and the beam section area of ??more than 0.7m2 or more.Ring.The vertical and horizontal level rods are perpendicular to the vertical direction of the vertical rod, and the fasteners are connected with each other.Second, the type selection and setting requirements all adopt the floor -to -ceiling steel pipe full red buckle. The setting must meet sufficient rigidity and stability to ensure that during the construction process, various construction operations will not produce loss, deformation, inclined tilt, tilt, tilt, tilt, inclined under the action of allowing loads to load., Twist and other phenomena.3. Methods See the layout of the plane. 4. Disassembling process see the demolition process of the outer grille 5. Quality and safety guarantee measures in accordance with the scheme of the outer grid
Red scaffolding of red scaffolding
1. Before setting, check the rod accessories, and the dry parts with unqualified specifications and quality shall not be used.2. The rods of the scaffolding cannot be mixed with steel and wood. The steel pipe rods must be connected with a qualified deduction, and they must not be bundled with lead wires at will.3. In the process of setting up the scaffolding, there must be a unified command.4. When building the surrounding scaffolding, you should start from one perspective, and then extend to the two sides. The vertical rod should be erected at one time according to the positioning, and the vertical and horizontal sweeping rod should be connected and fixed. Then set the first step to set the first step.The horizontal and vertical steel pipes, then fix it after the rod is vertical. The next setting must be carried out according to this step.