Scaffold refers to various brackets set up for workers and solve vertical and horizontal transportation at the construction site.The general term in the building industry refers to the place where the construction site is used on the outer wall, the internal decoration or the height of the building.The event scaffolding can help workers move their bodies freely and flexibly during the construction process, and the height can also achieve free stretching, and it is also very convenient when assembling and disassembling.
Activity scaffold construction plan
When setting up a scaffolding, a base must be erected, so that the left and right shake will not occur when the scaffolding is set up.And we must also deal with the foundation. We must first dig a deep pit for the ground. At the same time, we must consolidate the virtual land at the bottom of the pit to prevent the sinking.It is easy to fall into the soil, and then we have to lay a bottom plate in the soil, usually with solid wood.
Activity scaffold size
It is generally 6 meters, and the remaining length is processed as required.If it is a bowl buckle bracket, the length of the vertical rod is generally 1.2, 1.8, 2.4/3.0 meters. In order to adjust the height, there are three types: 0.9 meters, 1.5 meters, and 2.1 meters.Or at the bottom, there are four types: 0.3/0.6/0.9/1.2 meters.
Activity scaffolding specifications
First of all, when setting up scaffolding, it is necessary to design effective safety measures in accordance with strict construction plan.The second point is that when setting up an activity scaffolding, if the height is above 25 meters, it must be safer to use buckle steel tube scaffolding.Third, when the active scaffolding must be matched, it must be marked according to the needs of the project, and it must also indicate its purpose, as well as its largest static load, the largest dynamic load, and horizontal force.The fourth point is that when the steel pipe is built, it cannot be used, deforms, or corroded and damaged.
Activity scaffolding price
The scaffolding is also different according to different prices: the general two-row steel tube scooter price is about 15.5-17 yuan/square room; the outer single-row steel tube scaffolding is 12-13 yuan/square meter; the double-row steel pipe scaffold is 7-8 yuan/Square meter; a single row steel tube scaffolding 5-6 yuan/square.