HOME > NEWSarticle

Ou Lis empty anti -static floor installaon operon process 2024-07-21 16:45:25 internet

Ou Lis empty anti -static floor paste paving should ensure that the cement concrete mortar floor is not sand or empty, and the grassroots need to be cleaned up.The grassroots are not smooth. Use cement concrete mortar ground to find flat and pave the floor.
Ou Lis empty anti -static floor paste paving should ensure that the cement concrete mortar floor is not sand or empty, and the grassroots need to be cleaned up.The grassroots are not smooth. Use cement concrete mortar ground to find flat and pave the floor.Grassroots water content must not exceed 15%.When sticking the floor, it should be thin and well -proportioned.The difference between the two adjacent floor does not exceed 1 mm.
[Operation guidance of anti -static floor installation]
1. Carefully check the flatness of the ground and the vertical of the wall. If you find that there are great defects or require local renovation, you need to make it clear to the relevant departments of Party A;
2. Pull the horizontal line and bounce the floor installation high with ink lines on the wall to ensure that the paved anti -static floor is in the same level, determine the size, width and selection of the benchmark position in the house, and pop up the installation support on the ground on the ground.The network grid to ensure that the paving is flat, beautiful and generous, and at the same time, the cutting of the floor should be reduced as much as possible;
3. Adjust the support to the same necessaryness to be installed and place the branch at the cross point of the cross line of the ground grid line;
4. Use a installation screw to place the truss beam on the support, and use the horizontal ruler and right angle ruler to correct the truck one by one to make it not only in the same plane, but also perpendicular to each other;
5. Use the pyramider to place the active floor on the assembled truss;
6. If the size of the remaining size is less than the size of the active floor, you can use the cutting floor to complete;
7. When paving the anti -static floor, use the blisters horizontal instrument to flatten the ground. The height of the anti -static activity floor is adjusted by the adjustable support.Bringing edges, at the same time, clean the sanitation while spreading it to prevent existence of items and dust under the floor;
8. When installing heavier equipment in the computer room, you can install a branch under the floor of the device base to prevent the floor from changing;
9. When the HPL decorative board needs to be cut or opens, the opening of the opening concave corner shall be produced at the φ6 ~ φ8 stop hole to prevent the floor decorative surface after the production.