The stainless steel glass partition is a facade used to distinguish the space. There is a partition to the top, which is called a high partition; if it does not reach the top, it is called a low partition.Stainless steel glass partitions are widely used in our lives. In office decoration, office buildings, airports, convention and exhibition centers, we will find stainless steel glass partitions.
Stainless steel glass partition process
1. The customer communicates with the decoration company to explain the situation. What kind of partitions are probably wanted to do, whether it is office or home or a factory building.2. Determine the design effect according to the effect designer that the customer wants to see.3. Select the material to determine the overall renderings. After the design, take a look at the customer. If you are satisfied, start the construction.4. Construction steps: (1) Positioning line (2) Installation of embedded parts (3) Pillar fixation 5. Operation points: (1) Reporting sample diagrams (2) Drilling fixation 6. Construction preparation: (1) As for needsThe area and shape of the glass brick of the masonry glass brick are calculated.(2) Make a basic bottom angle according to the arrangement of glass bricks. (3) Repair and vertical vertical vertical vertical vertical vertical vertical on the side of the building wall surface connected to the glass brick.
Stainless steel glass partition quotation
The price of aluminum -magnesium alloy double -layer glass partition is ranging between 340 yuan and 420 yuan, and the stainless steel glass partition is between 240 yuan and 300 yuan.In fact, the price will not be fixed, because it depends on the requirements of the customer and the production plan on the spot.
Stainless steel glass partition installation
1. Positioning of the bullet line, first pop up the ground position line, and then use the vertical line to pop up the position line on the wall and the column, the height line and the top position line.There are frames of glass partition walls and fixed point positions.The vertical frame -free glass partition wall should check whether the position that has been done well is correct or the position of metal expansion bolts should be drawn out.2. Glass partition box feed and assemble.1) Office partition decoration: When there is a frame glass partition wall -type material, first review the actual size of the site. If the actual size and the size error of the construction drawing are greater than 5mm, the feeding should be pressed according to the actual size.If there is a horizontal horizontal gear, it should be based on a end of the vertical frame.The horizontal position line is drawn, including the width of the connection part to ensure that the installation position of the connector is accurate and the horizontal gear is on the same horizontal line.Special tools (profile cutting machines) should be used to ensure smooth and neat incision.2) Office glass partition assembly: The framework for assembling aluminum alloy glass partition walls can have two ways.The area of ??the partition wall is small, first assembled on the flat ground prefabrication, and then install it as a whole; when the area of ??the partition is large, the vertical profile of the partition wall, the top profile, the vertical profile of the wall and the middle position in the middle of the wall is directly pressed by the wall.The line position is fixed on the wall, ground, and top.The latter method is usually starting from one end of the partition wall frame. First, the vertical material of the wall against the wall is fixed with the aluminum angle, and then the horizontal profile is connected to the vertical profile through the aluminum angle.The installation method of aluminum corner parts is to first use two holes of ф3mm or ф4mm on the aluminum corner parts. The center of the hole is 10mm from the end of the aluminum corner part, and then uses a small cutter (the section shape and size are the same as the vertical profile) in the vertical material).The position of the vertical material line is drawn, and then the aluminum angle of the drilling holes is placed in this small cutter, grasping the small cutter, and the position must not move at all.The same holes are played on the profile, and the aluminum parts are fixed on the vertical profile with M4 or M5 self -attack screws.