The main raw materials include substrates, anti -static surface, brackets, beams, screws, etc., or include polymer enhanced materials, conductive agents, a certain proportion of fillers and additives.These raw materials need to be prepared in accordance with the requirements of production planning and design, and weigh and prepare to ensure accuracy and stability.
1. Material preparation: The main raw materials include substrates, anti -static veneers, brackets, beams, screws, etc., or include polymer enhancement materials, conductive agents, a certain percentage of fillers and additives.These raw materials need to be prepared in accordance with the requirements of production planning and design, and weigh and prepare to ensure accuracy and stability.
2. Steel shell processing: Cut the steel plate into the required size and processed, such as stamping, stretching, bending, punching, etc., to form the substrate structure of the Ooli anti -static floor.Among them, punching treatment is to facilitate subsequent grouting and reinforcement.
3. Phosphorus and spray paint: Swell, phosphorurate, and baked the good steel shells to enhance its anticorrosive performance.During the spray paint, the full automatic flow line is selected to spray the floor with a static spray coating process to ensure that the paint film is strong and adheres to the surface layer of the floor for a long time.
4. Brush: Swing the foaming cement or other filling charging to the steel shell, close the grouting mouth and wait for the filling to dry.The selection of filling charging will affect the quality and performance of the anti -static floor.
5. Paste the surface: Paste the anti -static surface on the substrate and collect the edge with conductive adhesive strips.The types and quality of the yarn also affect the performance and price of the floor.
6. Surface treatment: Clean the surface of the floor to remove excess glue and stains to improve the aesthetics and use performance of the floor.
7. Detection and packaging: Performance testing of the floor of the production, such as resistance testing, load -bearing capacity testing, etc. to ensure that it meets relevant standards and customer requirements.After the test is qualified, the packaging is not damaged during the transportation of the floor to protect the floor.
8. Delivery and installation: The floor is delivered to the designated location according to the customers requirements, and installation and debugging.