Yuba is a small home appliance product that combines the heating, infrared physical therapy, bathroom air replacement, decoration and other functions through special combinations of waterproof infrared lights and air -changing fans.In terms of its quality, TCL Yuba is still very cost -effective.
TCL bathing price
1. TCL Yuba Wubo One Integrated Ceiling Multifunctional Wind Warm Bath PTC Ultra -thin Air Conditioning Type 399 yuan 2. TCL Yuba Multi -Functional Lantern Embedment 239 yuan 3, TCL traditional ceiling four light lights warm yukaHeating Lighting Avilled Multifunctional Yubo 199 yuan 4. TCLTCLNS-11Y3B17/E1180W Four Light Embedded Light Warm Baths 169 yuan
TCL Yuba Repair
(1), the connection switch and the wiring column, the thread head is controlled between 6mm and 10mm, and other line heads are peeled out of the actual length.When conditions permit, it is convenient to remove the insulation layer of the plastic hard line. Here, it is required to use a wire tong and an electric knife to cut it.The core section of the wires is in the plastic hard line of 2.5 square centimeters and below. It can be cut with a steel wire clamp: first at the junction required by the online head, gently cut the insulating layer of the insulating layer with a steel wire tie.Hold the head of the steel wire and use the insulation layer to the insulation layer.When leradowing the insulating layer, do not add shear force to the mouth, which will hurt the core and even cut the wire.(2) For the insulating layer of plastic hard lines with a specification of more than 4 cm, it is difficult to cut it directly with steel wire clamps.First according to the length required by the line head, use the electric knife knife mouth to cut into the plastic insulating layer at a 45 -degree angle of the wire. Pay attention to mastering the knife mouth just cutting through the insulating layer without hurting the core.Then adjust the angle between the knife mouth and the wire to advance forward at 15 degrees, cut the insulating layer out of a gap, then turn the unsusted insulation layer backwards, and then use the electric knife.
TCL Yuba Installation
Installation method 1. Open the wind hole to determine the location of the ventilation holes on the wall (the slightly lower above the ceiling should be lower than that of the utensil centrifugal fans cover the air outlet to prevent the dew pouring in the ventilation pipe from pouring into the appliance) and open a round hole at this position.Install the ventilation window to put one end of the ventilation pipe on the ventilation window, and the other end is fixed at the outlet of the exterior wall from the outside of the wall along the windows. The gap between the ventilation pipe and the ventilation hole is filled with cement.2. Determine the installation position of Yuba In order to achieve the best heating effect, Yuba should be installed in the ceiling above the bathtub or bathroom.The ceiling is used with a small and not resonated material for the ceiling. After the installation is completed, the height of the bulb away from the ground should be between 2.1-2.3m.Excessive or too low will affect the use effect.3. The ceiling preparation is equipped with a wooden gear of 30 × 40mm. Pay attention to leave the air in the installation position according to the opening size. The height of the mezzanine space formed by the ceiling and the top of the house should not be less than 220mm.According to the actual size of the box, cut the corresponding square holes on the ceiling product installation position. The edge of the square hole should be no less than 250mm from the wall.
How about TCL Yuba
Middle brands, various indicators are average.The model is in the entire series, and the price is available from three to four hundred to one thousand.
Related tags: Appliances